(Finding the bug)
(Finding the bug)
Line 2: Line 2:
 
== Finding the bug ==
 
== Finding the bug ==
  
<pre>%    Ts was originally set to 1/13 and displayed only one cycle. Since we want 13
+
<pre>%    Ts was originally set to 1/13 (aka T0) and the graph displayed only one cycle. Since we want 13
%    cycles, divide this previous result by 13 again.
+
%    cycles, divide this previous Ts value by 13 again. Using Ts = T0/13 the proper grph is shown
  
 
F0 =13;  
 
F0 =13;  

Revision as of 10:46, 12 September 2008

Finding the bug

%    Ts was originally set to 1/13 (aka T0) and the graph displayed only one cycle. Since we want 13
%    cycles, divide this previous Ts value by 13 again. Using Ts = T0/13 the proper grph is shown

F0 =13; 
T0 =1/F0; 
Ts = T0/13; 
t  = 0:Ts:13*T0; 
x = real(exp(j*(2*pi*F0*t-pi/2)));
plot(t,x)

Alumni Liaison

Basic linear algebra uncovers and clarifies very important geometry and algebra.

Dr. Paul Garrett