Revision as of 07:44, 15 October 2008 by Huffmalm (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

So I have in my notes that E[x] of a Geometric RV = 1/p. and if p=1/n (from the hint provided by Hamad) then does that mean the expected value is n? that does not sound right to me.

Actually after thinking about it a little longer that does make sense because the prof could choose the same wrong key many times, so it would make sense that the expected value is actually the number of keys. But please let me know if there is something wrong with my logic.


//comment

Yes, this logic is correct as far as I can tell. I came up with the exact same thing using the geom(p)=1/p and p=1/n. Since he always has n keys at his disposal, this being the average number he needs to try would be logical. Evan Clinton

Alumni Liaison

Ph.D. 2007, working on developing cool imaging technologies for digital cameras, camera phones, and video surveillance cameras.

Buyue Zhang